What are the precautions for boiler low nitrogen transformation
时间:2021-12-20 浏览次数: 1098 作者: 加科

Precautions for commissioning and maintenance of gas burner during low nitrogen transformation of boiler:

1. In case of continuous failure of secondary ignition procedure of gas burner, shut down the burner to check whether the gas supply system of burner is normal and whether the circuit wiring is correct. Restart the burner after removing the fault;

2. It is forbidden to knock or rub the gas supply pipeline with a wrench or metal rod to avoid static electricity or spark and gas explosion;

3. Smoking, welding, cutting and other illegal operations are strictly prohibited at the gas supply valve group or pipeline flange surface;

4. It is strictly prohibited to conduct any open fire test near the pipeline, valve group and pressure regulating valve to avoid major accidents;

5. In the air supply pipeline, it has been emptied, but there are residual gas or droplets on the pipe wall. In case of, electrostatic spark and open fire, it will also cause combustion and explosion;

下载.png

6. When the valve group needs to be disassembled in case of failure, the main valve at the front end of the valve group must be cut off first, and then the gas in the pipeline from the main valve to the valve group shall be vented, and then the valve group can be disassembled and repaired;

7. It is forbidden to use non explosion-proof electric tools on site;

8. Before using the leak detection device, the valve group must be checked;

9. Before starting the combustion engine, the air supply pressure test must be carried out to check whether there is leakage. After confirming that it is normal, the simulation operation can be carried out;

10. When the burner is not in use, inform the customer to cut off the main air supply valve and main power supply switch;

11. It is not recommended to debug the burner at night;

12. At the end of commissioning, operators shall be organized to train them in the use and operation direction, and the operation process shall be established if necessary.


咨询热线
  • 座机:0531-83659330
  • 传真:0531-83382689
  • 邮箱:admin@gacoch.com
  • 总部地址:济南章丘区大友中心1号楼
最新动态
加科时代 | 天籁之音,环保之魂
加科时代 | 天籁之音,环保之魂

加科时代|天籁之音,环保之魂引言近日,江西天沅环保集团旗下潍坊昌乐大明生物科技有限公司600万大卡导热油锅炉煤气、···

+MORE
272024-04
加科装备携手国家电投打造绿色新动能
加科装备携手国家电投打造绿色新动能

国家电力投资集团有限公司(简称“国家电投”)是中央直接管理的特大型国有重要骨干企业,肩负保障国家能源安全的重要···

+MORE
102024-01
联系我们

24小时竭诚为您服务

13210550198(微信同号)

地址:山东济南章丘区大友中心1号楼

邮箱:admin@gacoch.com

电话
0531-83659330
微信
微信二位码
留言
返回顶部
加科(山东)智能装备有限公司 备案号:鲁ICP备17025986号-5
首页
产品
咨询
应用
服务