Talk about how the low nitrogen burner works
时间:2021-12-17 浏览次数: 1109 作者: 加科

   Today, Chongqing Chenxiao industrial burner manufacturer will share with you the operation and measures of low nitrogen burner transformation. Boiler check calculation the calculation of boiler is necessary for low nitrogen transformation. The detailed requirements include the following contents.

   Balance accounting between boiler combustion system and steam water system; The momentum of boiler power field and the influence index of transformation process on the power situation of burner. In general, it is required to reduce the emission of nitrides and maintain the boiler in an optimal stable state on the premise of completing the system transformation.

   Before the burner is installed, some preparatory operations are essential. First, the control of the horizontal viewpoint of the burner needs to be strict, the size of the deflection angle shall be measured accurately, and the verification operation shall be completed. The nozzle size and tangent diameter shall be determined according to the specifications to ensure that the design specifications are satisfied.

   For the transformation of burner cold state inspection, the tangential inspection of burner must be balanced. The calibration and balance of wind speed are also very necessary. It is necessary to confirm the best value through rigorous experiments. Combustion optimization and adjustment after transformation of low nitrogen burner.


咨询热线
  • 座机:0531-83659330
  • 传真:0531-83382689
  • 邮箱:admin@gacoch.com
  • 总部地址:济南章丘区大友中心1号楼
最新动态
加科时代 | 天籁之音,环保之魂
加科时代 | 天籁之音,环保之魂

加科时代|天籁之音,环保之魂引言近日,江西天沅环保集团旗下潍坊昌乐大明生物科技有限公司600万大卡导热油锅炉煤气、···

+MORE
272024-04
加科装备携手国家电投打造绿色新动能
加科装备携手国家电投打造绿色新动能

国家电力投资集团有限公司(简称“国家电投”)是中央直接管理的特大型国有重要骨干企业,肩负保障国家能源安全的重要···

+MORE
102024-01
联系我们

24小时竭诚为您服务

13210550198(微信同号)

地址:山东济南章丘区大友中心1号楼

邮箱:admin@gacoch.com

电话
0531-83659330
微信
微信二位码
留言
返回顶部
加科(山东)智能装备有限公司 备案号:鲁ICP备17025986号-5
首页
产品
咨询
应用
服务